Easy Expat International recherche un Team Leader Electricien avec minimum 15 ans d’expérience en management de projet CCGT et en Fuel Demand Modelpour une mission en Asie.

Scope of works : • Coordinate and liaise with other departments for the successful testingt and commissioning of 230 kV outdoor substation with 230 kV transmission line from the CCGT Power Project to the identified tie-in location inside the exiting Steel Mill switchyard along with automation and control systems which include : Protection Relays, annunciators, SCADA, RTU, Computers, Communication Gateways, and LANS • Check the 230 kV transmission systems for completeness for taking into service by completing the pre and post energizing checks • Ensure that the construction, testing and commissioning are carried out in accordance with the erms and conditions of PPA and BOT contract agreements • Manage the documentations for electrical commissioning, taking over certificates, as built drawings, manufacturer manuals and instructions, test procedure, risk assessments, environment health and safety statement and end of commissioning reports • Review the Fuel Demand Model proposed by the Project Company for compliance of Schedules of the PPA and provide training to team for operational period • Undertake an audit of the Fuel Demand Model provided by the Project Company

Durée de la mission : 12 mois renouvelables

N’hésitez pas à nous envoyer votre CV et vos disponibilités à : contact@www.easyexpat-international.com